Four SC200/200 VFD hoists were loaded at Qingdao port this week. The units are configured with 150 m masts, 3.2 m cages and PLC control panels labelled in English.
Delivery to site is scheduled for the first week of next month, with remote commissioning to follow.
只需楼高、所需载重和供电条件,我们可在1个工作日内给出机型、图纸与到岸价。