Four SC200/200 VFD hoists were loaded at Qingdao port this week. The units are configured with 150 m masts, 3.2 m cages and PLC control panels labelled in English.
Delivery to site is scheduled for the first week of next month, with remote commissioning to follow.
Building height, required payload and power supply are enough for us to come back with a model, a drawing and a delivered price within one working day.