A 32-storey residential tower with one core and a tight podium left no room for a second crane position. The contractor needed two hoists on the same mast line, working through the façade and fit-out phases without stopping.
Both cages were commissioned in nine days. The VFD cage held ±5 mm levelling during panel installation, and the shared spares kit covered both units — no second inventory at site.